Inspiration
Suzanne, detail
Work begins
Old school diazo paper plans
Lofting
More lofting
Molds made up
Assembly starts, December 2013
Inner stems glued up
One of 8 spars
birdsmouth detail
Test fit before epoxy
Garboard plank test fit
Starboard side view, garboard epoxied on
Classic bow shot. One set of planks on, 7 to go!
Garboards and second planks on
Lining off 3rd plank
Spliling
Still a lot of shape 3 planks into the hull
3 down, 4 to go!
"Marianita" is all planked up. Now the real fun begins!
First layer (of 4) for the aft deadwood/keel area
Fish-eye view of the bow
Amazing what a couple of coats of paint and flipping the picture over can do.
EunMara